RIDGID R175RNE Use and Care Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
14 – English
MAINTENANCE
REQUIRED DAILY CHECKLIST
See Figure 10, page 18.
Disconnect the air supply from the tool and remove all
fasteners.
Check all screws, nuts, bolts, and pins on the tool. If
any of these are loose, they must be tightened with the
appropriate size wrench.
Press the workpiece contact against a workpiece to
ensure that it moves smoothly.
With the workpiece contact depressed, pull the trigger.
The trigger should move smoothly, without binding.
While the tool is not loaded, connect the appropriate air
supply (at 70 psi) to the tool.
Select Single Sequential Actuation operation, Position A.
No air should leak from the tool.
Without pulling the trigger, presstheworkpiece
contact against a workpiece several times. The tool
must not operate.
With the workpiececontactnotengaged on the
workpiece, point the tool down and away and pull
the trigger several times. Hold the trigger in this
position for a minimum of 5 seconds. The tool must
not operate.
Press the workpiece contact firmly against the
workpiece and pull the trigger. The tool must operate.
•Withtheworkpiececontactstilldepressed,release
the trigger. The driver must return to its up position.
Select Contact Actuation operation, Position B.
With the workpiececontactnotengaged on the
workpiece, point the tool down and away. Pull the
trigger. The tool must not operate.
•Keepingthetriggerfullydepressed,pushtheworkpiece
contact against a workpiece. The tool must operate.
If the tool successfully meets all the requirements in this
checklist, it is ready for use. Set the trigger on the tool
to operate in the manner that best fits your application.
Load the proper fasteners for the desired application.
Set the depth of drive according to the “Drive Depth
Adjustment” section in this manual. Repeat this checklist
before using the tool each day, or if the tool is dropped
or damaged in any way.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 47 48

Comments to this Manuals

No comments